GCEDC Approved Projects

2024 Projects

MedTech Landing, LLC

Project Details - MedTech Landing, LLC is proposing to develop 80 units of market-rate housing in the town of Batavia. The $15 million project would construct seven apartment buildings totaling 100,000 square-feet and anticipates creating two full-time-equivalent (FTE) positions.

Project Application

Initial Resolution - January 11, 2024

Public Hearing - February 8, 2024 - Notice - Minutes - Video

Final Resolution - March 7, 2024

 

Leatherleaf Solar LLC

Project Details - Leatherleaf Solar, LLC is proposing to construct a community solar farm project on Ivison Road in the Town of Byron. The project will generate 5 MW (AC) of power.

Project Application

Initial Resolution - March 7, 2024

Public Hearing - March 26, 2024 - Notice - Minutes - Video

Final Resolution - March 28, 2024


2023 Projects

Atlas Copco USA Holdings Inc. & Subsidiaries (Edwards)

Project Details - Edwards is planning to build a dry pump manufacturing facility and two-story office building at STAMP for Phase I of their semiconductor supply chain factory of the future. The Phase I capital investment will be $209.25 million and plans to create 343 FTE’s.

Project Application

Initial Resolution - January 12, 2023

Public Hearing - January 31, 2023 - Notice - Minutes - Video

Final Resolution - February 2, 2023

Project Close Date - September 28, 2023

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 18012302A)

 

Horizon Acres Associates, Inc.

Project Details - Horizon Acres Associates, Inc. is seeking to develop six flex commercial/industrial facilities that will total 1,500,000 square feet in the Town of Pembroke on 115 buildable acres. The $142 million total project will be completed in phases, and projects to create 400 FTE’s at full build-out.

Project Application

Initial Resolution - January 12, 2023

Public Hearing - January 30, 2023 - Notice - Minutes - Video

Final Resolution - March 2, 2023

 

GSPP Route 262, LLC

Project Details - GSPP Route 262, LLC is proposing to construct a community solar farm project on Townline Road in the Town of Byron. The project will generate 5 MW of AC power.

Project Application

Initial Resolution - March 30, 2023

Public Hearing - April 19, 2023 - Notice - Minutes - Video

Final Resolution - June 1, 2023

 

LNK Holdings, Inc.

Project Details - LNK Holdings Inc. (Craft Cannery) is proposing to acquire and expand an agribusiness facility in Bergen which produces sauces, dressings, marinades, and other foods. The project will add 4,000 sq. ft. to the facility and support four full-time equivalent jobs and six retained jobs.

Project Application

Initial Resolution - May 4, 2023

Public Hearing - May 23, 2023 - Notice - Minutes - Video

Final Resolution - March 28, 2024

 

Oak Orchard Solar 3, LLC

Project Details - Oak Orchard Solar 3, LLC is proposing to construct a community solar farm project on Oak Orchard Road in the Town of Batavia. The project will generate 5 MW of AC power.

Project Application

Initial Resolution - August 3, 2023

Public Hearing - August 30, 2023 - Notice - Minutes - Video

Final Resolution - September 7, 2023

 

HP Hood LLC

Project Details - HP Hood LLC is proposing to construct a 32,500 sq. ft. expansion to accommodate approximately 7,500 more pallet positions in its automatic storage and retrieval system (ASRS) refrigerated warehouse. The project will also include the addition of new batching and processing systems, along with other upgrades which will allow the company to increase capacity and production of additional extended-shelf-life (ESL) beverage products.

Project Application

Initial Resolution - September 7, 2023

Public Hearing - September 28, 2023 - Notice - Minutes - Video

Final Resolution - March 7, 2024

 

Countryside Apartments, LLC

Project Details - Countryside Apartments, LLC is proposing to construct four 21,096 sq. ft. buildings of market-rate housing in the Town of Pembroke. The $15.65 million project would be built in phases, with each building having eight 1-bedroom and 16 2-bedroom units.

Project Application

Initial Resolution - October 5, 2023

Public Hearing - October 25, 2023 - Notice - Minutes - Video

Final Resolution - October 26, 2023

Supplemental Resolution - March 7, 2024

 

Graham Corporation

Project Details - Graham Corporation is proposing a 18,900 sq. ft. expansion in the City of Batavia. The $13.9 million project includes a new commercial production facility intended to reduce design and manufacturing costs and improving ship capabilities for their US defense sector. The project will include a new building as well as new manufacturing equipment to grow Graham Corporation's workforce and production capabilities.

Project Application

Initial Resolution - December 7, 2023

Public Hearing - January 4, 2024 - Notice - Minutes - Video


2022 Projects

Appletree Acres LLC

Project Details - Apple Tree Acres, LLC is building a 50,000 sq. ft. stand-alone facility on its property at Apple Tree Acres, in town of Bergen. The project is investing $3.15 million and is pledging to create 3 FTEs.

Project Application

Initial Resolution - January 13, 2022

Public Hearing - February 2, 2022 - Notice - Minutes - Video

Final Resolution - May 5, 2022

Project Close Date - June 29, 2022

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 22 01A)

 

O-AT-KA Milk Products, LLC

Project Details - O-AT-KA Milk Products, LLC is planning to build a 3,200 sq. ft. addition to its existing facility in the town of Batavia to support increasing capacities for cream-based liquor beverage production. The project is planning to invest $3.1 million and is planning to create 2 FTEs.

Project Application

Initial Resolution - May 5, 2022

Public Hearing - May 23, 2022 - Notice - Minutes - Video

Final Resolution - June 2, 2022

Project Close Date - July 29, 2022

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 22 04A)

 

NEXgistics

Project Details - NEXgistics is planning to construct a 140,000 square-foot facility on Vision Parkway in the Town of Pembroke. The $17.6 million project includes a distribution center and national headquarters.

Project Application

Initial Resolution - August 4, 2022

Public Hearing - August 22, 2022 - Notice - Minutes - Video

Final Resolution - September 1, 2022

Project Close Date - March 10, 2023

Project Agreement

PILOT Agreement

Report to PARIS - YES (Project 1801 22 07A)

 

Ivy Village Corp

Project Details - Ivy Village Corp is planning to construct a market-rate adult patio home development on 16 acres in the Village of Le Roy. The proposed $3.72 million project is for the construction of the initial 10 duplex residences (20 units total).

Project Application

Initial Resolution - July 7, 2022

Public Hearing - July 26, 2022 - Notice - Minutes - Video

Final Resolution - August 4, 2022

Project Close Date - July 28, 2023

Project Agreement

PILOT Agreement

Report to PARIS - YES (1801 22 08A)

 

RPNY Solar 6 LLC

Project Details - RPNY Solar 6, LLC is proposing to construct a community solar farm project on Alexander Road in the Town of Batavia. The project will utilize 8,346 solar panels and 24 string inverters on approximately 17 of 29 acres on the property to convert the sun’s energy into 3 MW of AC power.

Project Application

Initial Resolution - November 1, 2022

Public Hearing - November 21, 2022 - Notice - Minutes - Video

Final Resolution - December 1, 2022

Project Close Date - August 3, 2023

Project Agreement

PILOT Agreement

Report to PARIS - YES (Project 1801 22 12A)

 

RPNY Solar 7 LLC

Project Details - RPNY Solar 7, LLC is proposing to construct a community solar farm project on Alexander Road in the Town of Batavia. The project will utilize 6,214 solar panels and 20 string inverters on approximately 13 of 69 acres on the property to convert the sun’s energy into 2.5 MW of AC power. 

Project Application

Initial Resolution - November 1, 2022

Public Hearing - November 21, 2022 - Notice - Minutes - Video

Final Resolution - December 1, 2022

Project Close Date - August 3, 2023

Project Agreement

PILOT Agreement

Report to PARIS - YES (Project 1801 22 13A)

 

8250 Park Road LLC

Project Details - 8250 Park Road LLC is planning to purchase and renovate the former Quality Inn & Suites and Palm Island Indoor Water Park on Park Road in the Town of Batavia. The $12 million project will enable the company to upgrade the water park, hotel rooms, lobbies, event spaces, and on-site restaurant. The project pledges to create 38 full-time equivalent positions.

Project Application

Initial Resolution - October 6, 2022

Public Hearing - October 26, 2022 - Notice - Minutes - Video

Final Resolution - November 1, 2022

Report to PARIS - Project in Progress

 

AES Rt 5 Storage LLC

Project Details - AES Rt 5 Storage, LLC is proposing to construct a community solar farm project on West Main Road in the Town of Le Roy. The project will utilize ground-mounted solar panels to convert the sun’s energy into 5 MW of AC power.

Project Application

Initial Resolution - November 1, 2022

Public Hearing - November 22, 2022 - Notice - Minutes - Video

Final Resolution - December 1, 2022

Report to PARIS - Project in Progress

 

Hecate Energy Cider Solar LLC

Project Details - Hecate Energy Cider Solar LLC is proposing to construct a utility scale solar farm project at various properties in the towns of Elba and Oakfield. The project will be located on 2,455 acres and utilize solar panels mounted on tracking panel racks to convert the sun's energy into 500 MW of AC power and will be interconnected with the electric grid.

Project Application

Initial Resolution - November 1, 2022

Public Hearing (Elba) - November 28, 2022 - Notice - Minutes - Video

Public Hearing (Oakfield) - November 28, 2022 - Notice - Minutes - Video

Final Resolution - December 1, 2022

Report to PARIS - Project in Progress

 

NY CDG Genesee 4 LLC

Project Details - NY CDG Genesee 4 LLC is proposing to construct a community solar farm on Shepard Road in the town of Pavilion. The solar project will be located on approximately 31 of 39 acres on the property to convert the sun's energy into 4.275 MW of AC power.

Project Application

Initial Resolution - December 1, 2022

Public Hearing - January 4, 2023 - Notice - Minutes - Video

Final Resolution - January 12, 2023

Report to PARIS - Project in Progress

 

Franklin Real Estate & Development

Project Details - Franklin Real Estate & Development is planning on building two 7,725 square-foot, 8-unit market rate apartment buildings in the town of Pembroke. Each 2-story building consists of seven two-bedroom units and one one-bedroom unit. The $1.74 million project's buildings will total 15,460 square feet combined.

Project Application

Initial Resolution - January 13, 2022

Public Hearing - February 1, 2022 - Notice - Minutes - Video

Final Resolution - February 3, 2022

Report to PARIS - Project in Progress

 

J&R Fancher Property Holdings

Project Details - J&R Fancher Property Holdings LLC is planning to build a facility at Buffalo East Technology Park in the town of Pembroke on three acres. The facility will total 52,332 sq. ft. of which 45,000 sq.ft. pre-engineered steel warehouse building with 7,332 sq. ft. office. The project is investing $3.25 million and planning on creating 4 FTE’s. 

Project Application

Initial Resolution - March 3, 2022

Public Hearing - March 21, 2022 - Notice - Minutes - Video

Final Resolution - March 29, 2022

Report to PARIS - Project in Progress

 

La Fermière Inc.

Project Details - La Fermière Inc. is planning to build a 50,000 sq. ft. facility to produce French yogurt at the Genesee Valley Agri-Business Park in the town of Batavia on 20 acres. The project is planning to invest $25 million and planning to create 68 FTEs in the first 3 years of operation (and plans to create a total of 135 FTEs by year 5).

Project Application

Initial Resolution - May 5, 2022

Public Hearing - May 23, 2022 - Notice - Minutes - Video

Report to PARIS - Project in Progress


2021 Projects

LandPro Equipment LLC

Project Details - LandPro Equipment LLC is proposing to acquire and develop a 14-acre parcel in the town of Batavia, including the construction of a 50,000 square-foot facility for a full-service John Deere Agriculture and Turf Dealership. The company proposes to create five new jobs and retain 62 existing jobs as part of the $9.2 million project. The facility would service a customer base within a 50-mile radius of Batavia, NY and expand workforce training programs for the benefit of the company and Genesee County's workforce.

Project Application

Initial Resolution - February 4, 2021

Public Hearing - February 24, 2021 - Notice - Minutes - Video

Final Resolution - March 4, 2021

Project Close Date - June 25, 2021

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 21 01A)

 

Plug Power Inc.

Project Details - Plug Power Inc. is proposing a $232 million project at the Western New York Science & Technology Advanced Manufacturing Park in the town of Alabama. The operation will produce green hydrogen using an electrolysis process of water utilizing clean hydropower.

Project Application

Initial Resolution - March 4, 2021

Public Hearing - March 22, 2021 - Notice - Minutes - Video

Final Resolution - March 25, 2021

Supplemental Application

Public Hearing - June 3, 2021 - Notice - Minutes - Video

Supplemental Resolution - June 3, 2021

Authorizing Resolution - October 6, 2022

Project Close Date - November 8, 2021

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 21 04A)

 

Batavia Special Needs Apartments

Project Details - Batavia Special Needs Apartments, L.P. is proposing a $3.75 million expansion project in the City of Batavia. The applicant currently owns and operates a 42 unit building of special needs housing and will construct an additional 20 units for a total of 62 units. 

Project Application

Initial Resolution - March 25, 2021

Public Hearing - April 14, 2021 - Notice - Minutes - Video

Final Resolution - May 6, 2021

Project Close Date - September 15, 2021

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 21 09A)

 

Just Chez Realty (206 E. Main St.)

Project Details - Just Chez Realty, LLC, is proposing a $450,000 renovation project in the City of Batavia as part of Batavia's Downtown Revitalization Initiative. The project will create two market-rate apartments and follows the completion of first-floor improvements to the building.

Project Application

Final Resolution - July 1, 2021

Project Close Date - February 28, 2022

Project Agreement

Report to PARIS - Yes (1801 21 10A)

 

Trousdale Solar, LLC

Project Details - The company is proposing a 5 MW community solar farm project in the Town of Batavia (Batavia School District) that will be interconnected with National Grid and provide power to subscribers.

Project Application

Initial Resolution - July 1, 2021

Public Hearing - July 23, 2021 - Notice - Minutes - Video

Final Resolution - August 5, 2021

Authorizing Resolution - September 1, 2022

Project Close Date - April 7, 2022

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 21 12A)

 

Trousdale Solar II, LLC

Project Details - The company is proposing a 4 MW community solar farm project in the Town of Batavia (Batavia School District) that will be interconnected with National Grid and provide power to subscribers.

Project Application

Initial Resolution - July 1, 2021

Public Hearing - July 23, 2021 - Notice - Minutes - Video

Final Resolution - August 5, 2021

Authorizing Resolution - September 1, 2022

Project Close Date - April 7, 2022

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 21 13A)

 

Gateway GS, LLC

Project Details - Gateway GS LLC (Gallina Development) is proposing to build out a third building at the GCEDC's Gateway II Corporate Park in the town of Batavia. Facility will be 27,000 SF and will be completed in 2022 for a single logistics-distribution tenant.

Project Application

Initial Resolution - July 1, 2021

Public Hearing - July 23, 2021 - Notice - Minutes - Video

Final Resolution - August 5, 2021

Updated Final Resolution - January 13, 2022

Authorizing Resolution - March 3, 2022

Project Close Date - September 29, 2021

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 21 15A)

 

Liberty Pumps

Project Details - Liberty Pumps is proposing to expand their operation in the Town of Bergen at Apple Tree Acres industrial park. The company is planning to construct a warehouse and manufacturing space of 107,138 sf to support continuing growth of Liberty Pumps. The project is investing $13.7 million and is pledging to create 30 FTEs with an average salary of $52,000 annually plus benefits.

Project Application

Initial Resolution - August 5, 2021

Public Hearing - August 26, 2021 - Notice - Minutes - Video

Final Resolution - September 9, 2021

Project Close Date - November 21, 2021

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 21 16A)

 

Valiant Real Estate USA, Inc.

Project Details - Valiant Real Estate USA, Inc. is proposing to build a new 20,000 sq. ft. facility on the corner of Saile Drive and Call Parkway in the town of Batavia. The project is investing $4.5 million and is pledging to create 24 FTEs with an average salary range of $30,000-$75,000 annually plus benefits.

Project Application

Initial Resolution - September 9, 2021

Public Hearing - October 5, 2021 - Notice - Minutes - Video

Final Resolution - December 2, 2021

Project Close Date - December 21, 2021

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 21 17A)

 

J&R Fancher Property Holdings LLC (Brickhouse Commons LLC)

Project Details - J&R Fancher Property Holdings, LLC is proposing to construct a 14,000 square foot 2-story mixed-used building on 2.6 buildable acres at Buffalo East Technology Park in Pembroke. The $1.7 million project includes the creation of six market rate 1-bedroom and 2-bedroom apartments on the second floor, and a 7,000 "vanilla" box interior space to attract commercial tenants.

Project Application

Initial Resolution - September 9, 2021

Public Hearing - October 5, 2021 - Notice - Minutes - Video

Final Resolution - October 7, 2021

Project Close Date - May 19, 2022

Project Agreement

PILOT Agreement

Report to PARIS - Yes (1801 21 18A)

 

Mega Properties

Project Details - Mega Properties, Inc. is proposing to purchase a 147,000 square foot distribution facility on Federal Drive in the town of Batavia. The project is investing $8.5 million and is pledging to create 11 FTEs with an average salary range of $30,000-$80,000 annually plus benefits.

Project Application

Initial Resolution - December 2, 2021

Public Hearing - December 21, 2021 - Notice - Minutes - Video

Final Resolution - January 13, 2022

Project Close Date - December 2, 2022

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 21 19A)

 

Forefront Power LLC (Elba Solar)

Project Details - Forefront Power LLC is proposing a 5 MW community solar farm project in the Town of Elba (Elba School District) that will be interconnected with National Grid and provide power to subscribers.

Project Application

Initial Resolution - March 4, 2021

Public Hearing - March 22, 2021 - Notice - Minutes - Video

Final Resolution - May 6, 2021

Project Close Date - October 20, 2023

Project Agreement

PILOT Agreement

Report to PARIS - Project in Process

 

Solar Liberty 1

Project Details - Solar Liberty is proposing a 4 MW community solar farm project in the Town of Pembroke (Akron School District) that will be interconnected with National Grid and provide power to subscribers.

Project Application

Initial Resolution - March 4, 2021

Public Hearing - March 22, 2021 - Notice - Minutes - Video

Final Resolution - March 25, 2021

Report to PARIS - Project in Process

 

Solar Liberty 2

Project Details - Solar Liberty is proposing a 5 MW community solar farm project in the Town of Pembroke (Akron School District) that will be interconnected with National Grid and provide power to subscribers.

Project Application

Initial Resolution - March 4, 2021

Public Hearing - March 22, 2021 - Notice - Minutes - Video

Final Resolution - March 25, 2021

Report to PARIS - Project in Process

 

Excelsior Energy Center

Project Details - Excelsior Energy Center is proposing a 280 MW utility scale solar project in the Town of Byron (Byron-Bergen School District) that will be interconnected with the electric grid.

Project Application

Initial Resolution - March 25, 2021

Public Hearing - April 19, 2021 - Notice - Minutes - Video

Final Resolution - June 3, 2021

Authorizing Resolution - September 7, 2023

Report to PARIS - Project in Process

 

NY CDG Genesee 1 LLC

Project Details - The company is proposing a 5 MW community solar farm project in the Town of Elba (Elba School District) that will be interconnected with National Grid and provide power to subscribers.

Project Application

Initial Resolution - May 6, 2021

Public Hearing - May 17, 2021 - Notice - Minutes - Video

Final Resolution - August 5, 2021

Report to PARIS - Project in Process


2020 Projects

241 Knapp Solar 1, LLC

Project Details - 241 Knapp Solar 1, LLC (Borrego Solar) is a proposed community solar project in the town of Pembroke (Akron School District) that would generate 5 MW of power to subscribers.

Project Application

Initial Resolution - February 6, 2020

Public Hearing - February 28, 2020 - NoticeMinutesVideo

Final Resolution - March 5, 2020

Project Close Date - December 22, 2020

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 20 01A)

 

241 Knapp Solar 2, LLC

Project Details - 241 Knapp Solar 2, LLC (Borrego Solar) is a proposed community solar project in the town of Pembroke (Akron School District) that would generate 5 MW of power to subscribers.

Project Application

Initial Resolution - February 6, 2020

Public Hearing - February 28, 2020 - NoticeMinutesVideo

Final Resolution - March 5, 2020

Project Close Date - December 22, 2020

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 20 02A)

 

Townline Batavia Solar 1, LLC

Project Details - Townline Batavia Solar 1, LLC (Borrego Solar) is a proposed community solar project in the town of Batavia (Elba School District) that would generate 5 MW of power to subscribers.

Project Application

Initial Resolution - February 6, 2020

Public Hearing - March 2, 2020 - NoticeMinutesVideo

Final Resolution - March 5, 2020

Project Close Date - December 22, 2020

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 20 03A)

 

3104 Batavia Solar, LLC

Project Details - 3104 Batavia Solar, LLC (Borrego Solar) is a proposed community solar project in the town of Batavia (Pembroke School District) that would generate 3 MW of power to subscribers.

Project Application

Initial Resolution - February 6, 2020

Public Hearing - March 2, 2020 - NoticeMinutesVideo

Final Resolution - March 5, 2020

Project Close Date - May 22, 2020

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 02 04A)

 

3232 Batavia Solar, LLC

Project Details - 3232 Batavia Solar, LLC  (Borrego Solar) is a proposed community solar project in the town of Batavia (Pembroke School District) that would generate 4 MW of power to subscribers.

Project Application

Initial Resolution - February 6, 2020

Public Hearing - March 2, 2020 - NoticeMinutesVideo

Final Resolution - March 5, 2020

Project Close Date - May 22, 2020

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 02 05A)

 

V.J. Gautieri Constructors, Inc. (Ellicott Place)

Project Details - Ellicott Place is a proposed project to renovate an existing building in the city of Batavia (Batavia School District) that will create 10 market-rate apartments and first-floor business facilities, and exterior building rehabilitation to support tenant retention and attraction. Total investment is $3.1 million.

Project Application

Initial Resolution - February 6, 2020

Public Hearing - March 3, 2020 - NoticeMinutesVideo

Final Resolution - March 5, 2020

Project Close Date - July 29, 2020

Project Agreement

Report to PARIS - Yes (Project 1801 20 06A)

 

Ellicott Station LLC

Project Details - The Ellicott Station project is a proposed mixed-use brownfield redevelopment project including adaptive re-use and new construction of a blighted property in the city of Batavia. The $22.4 million total investment would complete the brownfield remediation of the 3.31-acre site, construct a new five-story modern workforce housing apartment building, and renovate an existing building for a restaurant/beer garden and brewery.

Project Application

Initial Resolution - February 6, 2020

Public Hearing - March 3, 2020 - NoticeMinutesVideo

Final Resolution - March 5, 2020

Authorizing Resolution - July 1, 2021

Authorizing Resolution - October 28, 2021

Project Close Date - July 21, 2021

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 21 07A)

 

Ellicott Station Commercial LLC

Project Details - The Ellicott Station project is a proposed mixed-use brownfield redevelopment project including adaptive re-use and new construction of a blighted property in the city of Batavia. The $22.4 million total investment would complete the brownfield remediation of the 3.31-acre site, construct a new five-story modern workforce housing apartment building, and renovate an existing building for a restaurant/beer garden and brewery.

Project Application

Initial Resolution - February 6, 2020

Public Hearing - March 3, 2020 - NoticeMinutesVideo

Final Resolution - March 5, 2020

Authorizing Resolution - July 1, 2021

Authorizing Resolution - October 28, 2021

Project Close Date - July 21, 2021

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 21 08A)

 

Bright Oak Solar, LLC

Project Details - Bright Oak Solar, LLC is a proposed community solar project in the town of Batavia (Oakfield-Alabama School District) that would generate 4 MW of power to subscribers.

Project Application

Initial Resolution - May 7, 2020

Public Hearing - May 26, 2020 - NoticeMinutesVideo

Final Resolution - June 4, 2020

Project Close Date - September 30, 2020

Project Agreement

PILOT Agreement

Report to PARIS - Yes (1801 20 09A)

 

Fraser-Branche Property, LLC

Project Details - The company plans to acquire and renovate an existing 13,000 sq. ft. facility in the city of Batavia to accommodate the expansion of their pediatric medical practice alongside existing tenants.

Project Application

Initial Resolution - October 31, 2019

Public Hearing - November 20, 2019 - NoticeMinutes

Final Resolution - July 2, 2020

Project Close Date - September 3, 2020

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 20 10A)

 

Batavia Solar, LLC

Project Details - Batavia Solar, LLC is a proposed community solar project in the town of Batavia (Byron-Bergen School District) that would generate 1.65 MW of power to subscribers.

Project Application

Initial Resolution - August 6, 2020

Public Hearing - September 2, 2020 - NoticeMinutesVideo

Final Resolution - August 5, 2021

Project Close Date - January 27, 2023

Project Agreement

PILOT Agreement

Report to PARIS - Yes (1801 21 14A)

 

J & R Fancher Property Holdings LLC

Project Details - J & R Fancher Property Holdings, LLC is a proposed project that will construct a three-story, mixed-use building at the Buffalo East Technology Park in Pembroke, NY. The $3 million project includes the creation of 17 market-rate apartments and four 'vanilla box' spaces for commercial tenants.

Project Application

Initial Resolution - May 7, 2020

Public Hearing - May 26, 2020 - NoticeMinutesVideo

Final Resolution - July 2, 2020

Report to PARIS - Project in Process

 

Batavia Senior Housing Preservation, LLC

Project Details - The company is proposing a $12.8 million recapitalization and renovation to preserve an existing senior housing apartment complex in City of Batavia.

Project Application

Initial Resolution - July 2, 2020

Public Hearing - August 17, 2020 - Notice - Minutes - Video

Final Resolution - October 1, 2020

Report to PARIS - Project in Process


2019 Projects

Churchville Fire Equipment Corp.

Project Details - The company is purchasing an existing facility to be their new truck set-up shop and truck refurbishment center.

Project Application

Final ResolutionJanuary 10, 2019

Project Close Date - February 7, 2019

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 19 01A)

 

CVO Central, LLC (Custom Vehicle Outfitters)

Project Details - The distribution company is moving from a leased facility to purchasing the former PW Minor existing facility in the City of Batavia. The company's project will seek to make renovations to the facility.

Project Application

Final ResolutionMarch 28, 2019

Project Close Date - June 24, 2019

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 19 03A)

 

Gateway GS, LLC

Project Details - The company has built a 27,000 sq. ft. speculative building at Gateway II Corporate Park in Batavia. This will be Phase 1 of 5; interior buildout of the first building. The building is engineered to be flexible for prospective tenants, who will ultimately lease the space and have input to the final buildout. The tenants that this type of building will attract include warehouse, distribution, light manufacturing, technology, and office space tenants. 

Project Application

Initial ResolutionFebruary 7, 2019

Public Hearing - March 5, 2019 - NoticeMinutes

Final ResolutionMarch 7, 2019

Project Close Date - May 1, 2019

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 19 04A)

 

Mucher & Clark, LLC (Cedar Street Rentals)

Project Details - The company plans to build an extension of its retail store by constructing a 6,000 sq. ft. warehouse at 52 Cedar Street. Cedar Street Sales & Rental has been in Business since 1993 and needs to expand to meet customer demand.

Project Application

Final ResolutionJune 6, 2019

Project Close Date - October 4, 2019

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 19 05A)

 

Graham Corporation

Project Details - The company plans three projects at its City of Batavia campus which will renovate 8,000 sq. ft. of existing buildings and add 5,000 sq. ft. of new warehouse space, including expansion of on-site training and welding school facilities, and warehousing.

Project Application / Supplemental Project Application

Initial ResolutionFebruary 7, 2019

Public Hearing - February 26, 2019 - NoticeMinutes

Final ResolutionAugust 1, 2019

Supplemental Initial ResolutionAugust 1, 2019

Supplemental Public Hearing - August 26, 2019 - NoticeMinutes

Supplemental Final ResolutionSeptember 5, 2019

Project Close Date - November 1, 2019

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 19 06A)

 

Provident Batavia, LLC

Project Details - The company is looking to construct a 13,000 sq. ft. addition to an existing office, warehouse and distribution facility leased to SCP Pools in the Town of Batavia. This project enables the growth of SCP Pools.

Project Application

Initial ResolutionJuly 11, 2019

Public Hearing - July 30, 2019 - NoticeMinutes

Final ResolutionSeptember 5, 2019

Project Close Date - November 12, 2019

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 19 07A)

 

Six Flags Darien, LLC

Project Details - The company is adding a new attraction to the park for the 2020 operating season.

Project Application

Initial ResolutionSeptember 5, 2019

Public Hearing - October 2, 2019 - NoticeMinutes

Final ResolutionOctober 3, 2019

Project Close Date - October 3, 2019

Project Agreement

Report to PARIS - Yes (Project 1801 19 08A)

 

Wright Associates, LLC

Project Details - The company is planning to acquire and renovate an existing 139,000 sq. ft. facility to expand product lines and distribution markets in the Western New York and the Finger Lakes regions.

Project Application

Initial ResolutionOctober 3, 2019

Public Hearing - October 29, 2019 - NoticeMinutes

Final ResolutionOctober 31, 2019

Project Close Date - November 27, 2019

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 19 09A)

 

Ken Wendt's Propane Gas Service, Inc.

Project Details - The company is planning to build a 9,600 sq. ft. facility at the corner of Route 19 and North Road in the Town of LeRoy. The company plans to expand its propane service to local residential, commercial, industrial, and agricultural customers. 

Project Application

Initial ResolutionAugust 1, 2019

Public Hearing - August 27, 2019 - NoticeMinutes

Final ResolutionOctober 31, 2019

Authorizing ResolutionMarch 29, 2022

Project Close Date - December 18, 2019

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 19 10A)


2018 Projects

Saile Properties, LLC (L&M Specialty Fabrication)

Project Details - Saile Properties, LLC plans to construct a 21,100 sq. ft. facility in Batavia for expansion of specialty agricultural equipment manufacturing and repair business.

Project Application

Initial ResolutionSeptember 1, 2016

Public Hearing - September 21, 2016 - NoticeMinutes

Final ResolutionFebruary 1, 2018

Project Close Date - April 1, 2018

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 18 02A)

 

Xylem Dewatering Solutions, Inc.

Project Details - Xylem (Godwin Pumps) plans to expand their existing facility in Batavia by 8,100 sq. ft. 

Project Application

Initial ResolutionMarch 29, 2018

Public Hearing - April 17, 2018 - NoticeMinutes

Final ResolutionMay 3, 2018

Project Close Date - May 31, 2018

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 18 03A)

 

Genesee Lumber Co., Inc.

Project Details - Genesee Lumber Company plans to demolish an existing structure and construct a 7,158 sq. ft. warehouse in Batavia to store lumber and other building products to better service customers in Genesee County and the surrounding region. This project will contribute to the City of Batavia's Batavia Pathway to Prosperity program.

Project Application

Final ResolutionMarch 29, 2018

Project Close Date - February 28, 2019

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 18 04A)

 

J-Rental, Inc.

Project Details - J-Rental, Inc plans to build a 60,000 sq. ft. facility at Apple Tree Acres in Bergen.

Project Application

Initial ResolutionJune 7, 2018

Public Hearing - June 26, 2018 - NoticeMinutes

Final ResolutionJuly 12, 2018

Project Close Date - February 27, 2019

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 18 05A)

 

Pearl Solar, LLC

Project Details - Pearl Solar, LLC plans to build a 2 MW community solar farm project in Batavia.

Project Application

Initial Resolution July 12, 2018

Public Hearing - July 30, 2018 - NoticeMinutes

Final ResolutionAugust 2, 2018

Project Close Date - January 11, 2019

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 18 07A)

 

Pearl Solar II, LLC

Project Details - Pearl Solar II, LLC plans to build a 2 MW community solar farm project in Batavia.

Project Application

Initial ResolutionJuly 12, 2018

Public Hearing - July 30, 2018 - NoticeMinutes

Final ResolutionAugust 2, 2018

Project Closing Date - January 11, 2019

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 18 08A)

 

Amada North America, Inc.

Project Details - Amada North America, Inc. is planning a 19,000 sq. ft. expansion to their manufacturing facility in Batavia. In addition to the $2.3M construction project, the company is investing over $6.5M in new equipment.

Project Application

Initial ResolutionSeptember 6, 2018

Public Hearing - October 2, 2018 - Notice - Minutes

Final ResolutionOctober 4, 2018

Project Close Date - November 9, 2018

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 18 10A)


2017 Projects

HP Hood, LLC (Project Dairy) - 1801 17 01A

Project Details - HP Hood, LLC plans to purchase, refurbish, restart, and expand an existing dairy processing facility at the Genesee Valley Agri-Business Park in Batavia. The project would invest $205M in facility, processing and filling equipment, building improvements including adding new construction of a 100,000 sq. ft. refrigerated warehouse.

Project Application

Initial ResolutionJune 12, 2017

Public Hearing - June 27, 2017 - NoticeMinutes

Final ResolutionJune 27, 2017

Project Close Date - June 30, 2017

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 17 01A)

 

ADVJ Realty, LLC (Coach Tony's)

Project Details - Coach Tony's, a specialty food processor of sauces, plans to construct a 5,000 sq. ft. building at the Apple Tree Acres Corporate Park in Bergen.

Project Application

Final ResolutionJuly 11, 2017

Project Close Date - February 20, 2018

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 17 02A)

 

Freightliner & Western Star of Batavia, LLC

Project Details - Freightliner & Western Star of Batavia, LLC plans to construct a 40,000 sq. ft. parts warehouse and service center in Batavia.

Project Application

Initial ResolutionJuly 14, 2016

Public Hearing - July 29, 2016 - NoticeMinutes

Final ResolutionJuly 11, 2017

Project Close Date - August 31, 2018

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 17 03A)

 

Genesee and Mohawk Valley Railroad Co., Inc. (GVT)

Project Details - Genesee and Mohawk Valley Railroad Co., Inc. plans to add 12,160 sq. ft. expansion to its existing 25,000 sq. ft. cross dock facility in Batavia.

Project Application

Initial ResolutionMarch 2, 2017

Public Hearing - March 28, 2017 - NoticeMinutes

Final ResolutionMay 4, 2017

Project Close Date - August 15, 2017

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 17 04A)

 

6520 N. Lake Rd, LLC (Triple-O Mechanical)

Project Details - 6250 N. Lake Rd, LLC plans to expand their current facility (6,960 sq. ft.) in the Town of Bergen with the addition of a 7,644 sq. ft. warehouse.

Project Application

Final ResolutionOctober 5, 2017

Project Close Date - January 1, 2018

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 17 08A)

 

212 West Main Street, Inc.

Project Details - 212 West Main Street, Inc. plans a complete interior and exterior renovation, along with purchasing equipment. The total project cost is estimated at $895,000. The project has extraordinary re-development costs associated with the property because it is located within a federally designated flood hazard area. The project is legally allowable for benefits as it is in/or adjacent to a highly distressed census tract. 

Project Application

Final ResolutionOctober 5, 2017

Project Close Date - November 1, 2017

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 17 09A)

 

O-AT-KA Milk Products Cooperative, Inc.

Project Details - O-AT-KA plans to construct a 20,075-sq. ft. expansion of the current facility increase future growth opportunities for the business. The company plans to invest approximately $4.3M and retain 308 jobs.

Project Application

Initial ResolutionOctober 5, 2017

Public Hearing - October 24, 2017 - NoticeMinutes

Final ResolutionOctober 26, 2017

Project Close Date - March 1, 2018

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 17 11A)


2016 Projects

Genesee County Chamber of Commerce

Project Details - The Genesee County Chamber of Commerce plans to purchase and renovate an existing building for use of its offices as well as the County's tourism office, and add a new 560 sq. ft., two-story glass structure for a Genesee County Visitors Tourism Center. 

Project Application

Final ResolutionOctober 1, 2015

Project Close Date - January 29, 2016

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 16 01A)

 

Upstate Niagara Cooperative (former Alpina Foods LLC)

Project Details - The former owner of the facility, now owned by Upstate Niagara Cooperative, plans to construct a 3,200 sq. ft. addition to an existing facility to add a new bottle filling machine and package equipment to produce drinkable yogurt.

Project Application

Final ResolutionMay 5, 2016

Project Close Date - May 5, 2016

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 16 03A)

 

Mega Properties

Project Details - Mega Properties plans to expand its current 45,000 sq. ft. logistics facility hosting Koolatron Corporation and other tenants in the Gateway I Corporate Park by 25,000 sq. 

Project Application

Initial Resolution - March 3, 2016

Public Hearing - March 23, 2016 - NoticeMinutes

Final ResolutionNovember 4, 2016

Authorizing ResolutionDecember 16, 2016

Project Close Date - May 12, 2017

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 16 04A)

 

Empire Pipeline Inc.

Project Application

Initial ResolutionOctober 6, 2016

Public Hearing - October 24, 2016 - NoticeMinutes

Final ResolutionDecember 1, 2016

Project Close Date - December 1, 2016

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Extension of Project 1801 07 04B)


2015 Projects

Manning Squires & Hennig

Project Application

Initial Resolution - June 4, 2015

Public Hearing - June 23, 2015 - NoticeMinutes

Final Resolution - June 25, 2015

Authorizing Resolution - December 17, 2015

Project Close Date - June 25, 2015

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 15 04A)

 

ADK Hospitality

Project Application

Initial Resolution - June 4, 2015

Public Hearing - June 22, 2015 - NoticeMinutes

Final Resolution - June 25, 2015

Project Close Date - September 4, 2015

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 15 05A)

 

OATKA Milk Products Cooperative Inc.

Project Application

Initial Resolution - August 13, 2015

Public Hearing - August 31, 2015 - NoticeMinutes

Final Resolution - September 3, 2015

Project Close Date - October 1, 2015

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 15 06A)

 

Reinhart Enterprises

Project Application

Initial Resolution - September 3, 2015

Public Hearing - September 23, 2015 - NoticeMinutes

Final Resolution - October 1, 2015

Project Close Date - October 1, 2015

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 15 07A)


2014 Projects

Tompkins Insurance Agencies, Inc.

Project Application

Final Resolution - March 6, 2014

Project Close Date - April 7, 2014

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 14 01A)

 

Mega Properties, Inc.

Project Application

Initial Resolution - June 6, 2013

Public Hearing - June 26, 2013 - NoticeMinutes

Final Resolution - April 3, 2014

Project Close Date - June 16, 2014

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 14 03A)

 

R.J. Properties LLC (Liberty Pumps)

Project Application

Initial Resolution - March 6, 2014

Public Hearing - April 3, 2014 - NoticeMinutes

Final Resolution - May 1, 2014

Project Close Date - August 1, 2014

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 14 06A)


2013 Projects

CLP Darien Lake, LLC

Project Application

Initial Resolution - February 7, 2013

Public Hearing - March 1, 2013 - NoticeMinutes

Final Resolution - March 3, 2013

Project Close Date - February 7, 2013

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 13 01A)

 

Imagination Industries

Project Application

Final Resolution - June 6, 2013

Authorizing Resolution - July 11, 2013

Project Close Date - July 11, 2013

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 13 07A)

 

Yancey’s Fancy

Project Application

Initial Resolution - March 7, 2013

Public Hearing - April 16, 2013 - NoticeMinutes

Supplemental Initial Resolution - September 5, 2013

Supplemental Public Hearing - September 25, 2013 - NoticeMinutes

Final Resolution - October 3, 2013

Project Close Date - March 25, 2014

Project Agreement

PILOT Agreement

Supplemental Application

Supplemental Initial Resolution - October 3, 2019

Supplemental Public Hearing - October 23, 2019 - NoticeMinutes

Supplemental Final Resolution - October 31, 2019

Project Close Date - April 1, 2020

Supplemental Project Agreement

Supplemental PILOT Agreement

Report to PARIS - Yes (Project 1801 13 14A)

 

Graham Corporation

Project Application

Initial Resolution - August 1, 2013

Public Hearing - August 21, 2013 - NoticeMinutes

Final Resolution - September 5, 2013

Supplemental Public Hearing - October 22, 2013 - NoticeMinutes

Supplemental Final Resolution - November 7, 2013

Supplemental Final Resolution - July 10, 2014

Project Close Date - August 1, 2013

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 13 17A)


2012 Projects

Lassiter Properties

Project Application

Final Resolution - March 1, 2012

Project Close Date - March 1, 2012

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 12 04A)

 

5272 Clinton St Rd, LLC

Project Application

Final Resolutionn - March 1, 2012

Project Close Date - March 1, 2012

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 12 05A)

 

Perry Veterinary Clinic PPLC

Project Application

Final Resolution - May 3, 2012

Project Close Date - June 12, 2012

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 12 07A)

 

Steval LLC (LeRoy Motors / Bob Johnson GM)

Project Application

Final Resolution - June 12, 2012

Project Close Date - July 1, 2012

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 12 11A)


2011 Projects

Call Farms, Inc. (Monroe Tractor)

Project Application

Final Resolution - March 31, 2011

Project Close Date - March 31, 2011

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 11 02A)

 

Graham Corporation

Project Application

Initial Resolution - July 7, 2011

Public Hearing - July 26, 2011 - NoticeMinutes

Final Resolution - August 4, 2011

Project Close Date - July 7, 2011

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 11 03A)

 

Alpina Foods LLC (Upstate Niagara Cooperation)

Project Application

Initial Resolution - April 14, 2011

Public Hearing - May 3, 2011 - NoticeMinutes

Final Resolution - June 2, 2011

Project Close Date - June 2, 2011

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 11 07A)

 

Berkshire Hospitality

Project Application

Initial Resolution - December 2, 2010

Public Hearing - February 1, 2011 - NoticeMinutes

Final Resolution - April 14, 2011

Project Close Date - October 1, 2011

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 11 08A)

 

Marktec Products, Inc. (Cox Properties LLC)

Project Application

Final Resolution - August 4, 2011

Project Close Date - November 1, 2011

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 1109A)

 

Adams Welding and Fabrication

Project Application

Final Resolution - November 3, 2011

Project Close Date - December 1, 2011

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 11 10A)


2010 Projects

Parc Darien Lake, LLC

Project Application

Public Hearing - March 11, 2010 - NoticeMinutes

Final Resolution - March 11, 2010

Project Close Date - March 11, 2010

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 10 02A)

 

Pineyard Acres, LLC (Odyssey Controls)

Project Application

Final Resolution - October 7, 2010

Project Close Date - October 7, 2010

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 10 06A)

 

Darien Lake Hospitality, LLC (Holiday Inn)

Project Application

Final Resolution - August 5, 2010

Project Close Date - February 1, 2011

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 10 08A)


2009 Projects

BGW Properties LLC

Project Application

Final Resolution - December 3, 2009

Project Close Date - December 4, 2009

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 09 07A)


2008 Projects

Batavia Special Needs APARTMENTS, L.P.

Project Application

Initial Resolution - February 29, 2008

Public Hearing - April 24, 2008 - NoticeMinutes

Final Resolution - November 25, 2008

Project Close Date - March 23, 2009

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 08 07A)

 

Wedge 24 (Creekside)

Project Application

Final Resolution - March 14, 2008

Project Close Date - March 14, 2008

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 08 09A)


2007 Projects

Empire Pipeline

Project Application

Initial Resolution - January 23, 2007

Public Hearing - March 13, 2007 - NoticeMinutes

Final Resolution - March 14, 2007

Project Close Date - July 1, 2007

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 07 04B)


2006 Projects

Wellsville Carpet Town, Inc.

Project Application

Preliminary Resolution - April 12, 2006

Initial Resolution - April 27, 2006

Public Hearing - July 6, 2006 - Minutes

Final Resolution - July 12, 2006

Public Hearing - August 28, 2006 - NoticeMinutes

Project Close Date - April 27, 2006

Project Agreement

PILOT Agreement

Report to PARIS - Yes (Project 1801 06 08A)