Mega-Site

STAMP features sites with up to 310 contiguous, buildable acres, with over 500 acres available. Existing users include a green hydrogen manufacturer under construction, and a semiconductor equipment manufacturer starting construction in 2024. STAMP is owned and developed by the Genesee County Economic Development Center.

STAMP Map

 

Featured Properties

Crosby Road North Site

  • 310 acres
  • Frontage on Crosby Road
  • Electric substation, electric distribution adjacent to site
  • Water, wastewater, gas central utility area adjacent to site
  • 5 miles to Interstate 90
  • Subdividable

 

Crosby Road South Site

  • 80 acres
  • Frontage on Crosby Road
  • Build-to-suit development available
  • 5 miles to Interstate 90
  • Subdividable

 

STAMP Drive West Site

  • 16 acres
  • Frontage on Crosby Road and STAMP Drive
  • Electric distribution adjacent to site
  • Water, wastewater, gas central utility area adjacent to site 
  • 5 miles to Interstate 90

STAMP Drive East Site

  • 41 acres and 14 acres
  • Frontage on STAMP Drive
  • Electric distribution adjacent to site
  • Water, wastewater, gas central utility area adjacent to site 
  • 5 miles to Interstate 90

STAMP Drive East Site

Contact Chris Suozzi, GCEDC Vice President of Business & Workforce Development, at 585-409-1301 or [email protected] to Advance Your Project at STAMP!