GCEDC Approved Projects

2022 Projects

Appletree Acres LLC (Final Resolution Approved)
Apple Tree Acres, LLC is building a 50,000 sq. ft. stand-alone facility on its property at Apple Tree Acres, in town of Bergen. The project is investing $3.15 million and is pledging to create 3 FTEs with an average salary range of $30,000-$35,000 annually plus benefits.
Project Application
Initial Resolution - Approved January 13, 2022
Public Hearing - February 2, 2022 - Notice - Minutes - Video
Final Resolution - Approved May 5, 2022
Agent Agreement
Project Close Date
Report to PARIS

 

Franklin Real Estate & Development (Final Resolution Approved)
Franklin Real Estate & Development is planning on building two 7,725 square-foot, 8-unit market rate apartment buildings in the town of Pembroke.  Each 2-story building consists of 7 two-bedroom units and 1 one-bedroom unit. The $1.74 million project's buildings will total 15,460 square feet combined.
Project Application
Initial Resolution - Approved January 13, 2022
Public Hearing - February 1, 2022 - Notice - Minutes - Video
Final Resolution - Approved February 3, 2022
Agent Agreement
Project Close Date
Report to PARIS

 

18012118A - J&R Fancher Property Holdings (Brickhouse Commons LLC)
J&R Fancher Property Holdings LLC is planning on building a facility at Buffalo East Technology Park in the town of Pembroke on 3 acres.
The facility will total 52,332 sq. ft. of which 45,000 sq.ft. pre-engineered steel warehouse building with 7,332 sq. ft. office. The project is investing $3.25 million and planning on creating 4 FTE’s. 
Project Application
Initial Resolution - Approved March 3, 2022
Public Hearing - March 21, 2022 - Notice - Minutes - Video
Final Resolution - Approved March 29, 2022
Agent Agreement
Project Close Date - May 5, 2019
Report to PARIS

 

La Fermière Inc. (Public Hearing Held)
La Fermière Inc. is planning on building a 50,000 sq. ft. facility to produce French yogurt at the Genesee Valley Agri-Business Park in the town of Batavia on 20 acres.
The project is planning on investing $25 million and planning to create 68 FTEs in the first 3 years of operation (and plans to create a total of 135 FTEs by year 5).
Project Application
Initial Resolution - Approved May 5, 2022
Public Hearing - May 23, 2022 - Notice - Minutes - Video
Final Resolution
Agent Agreement
Project Close Date
Report to PARIS

 

O-AT-KA Milk Products, LLC (Final Resolution Approved)
O-AT-KA Milk Products, LLC is planning on building a 3,200 sq. ft. addition to its existing facility in the town of Batavia to support increasing capacities for cream based liquor beverage production.
The project is planning on investing $3.1 million and is planning to create 2 FTEs.
Project Application
Initial Resolution - Approved May 5, 2022
Public Hearing - May 23, 2022 - Notice - Minutes - Video
Final Resolution - Approved June 2, 2022
Agent Agreement
Project Close Date
Report to PARIS

 

Ivy Village Corp (Final Resolution Approved)
Ivy Village Corp is planning to construct a market-rate adult patio home development on 16 acres in the Village of Le Roy. The proposed $3.72 million project is for the construction of the initial 10 duplex residences (20 units total).
Project Application
Initial Resolution - Approved July 7, 2022
Public Hearing - July 26, 2022 - Notice - Minutes - Video
Final Resolution - Approved August 4, 2022
Agent Agreement
Project Close Date
Report to PARIS

 

Nexgistics (Public Hearing Held)
Nexgistics is planning to construct a 140,000 square-foot facility on Vision Parkway in the Town of Pembroke. The $17.6 million project includes a distribution center and national headquarters.
Project Application
Initial Resolution - Approved August 4, 2022
Public Hearing - August 22, 2022 - Notice - Minutes - Video
Final Resolution
Agent Agreement
Project Close Date
Report to PARIS

2021 Projects

 
LandPro Equipment LLC - 1801 21 01A
LandPro Equipment LLC is proposing to acquire and develop a 14-acre parcel in the town of Batavia, including the construction of a 50,000 square-foot facility for a full-service John Deere Agriculture and Turf Dealership.
The company proposes to create 5 new jobs and retain 62 existing jobs as part of the $9.2 million project. The facility would service a customer base within a 50-mile radius of Batavia, NY and expand workforce training programs for the benefit of the company and Genesee County's workforce.
Project Application
Initial Resolution - Approved February 4, 2021
Public Hearing - February 24, 2021 - Notice - Minutes - Video
Final Resolution - Approved March 4, 2021
Agent Agreement
Project Close Date - June 25, 2021
Report to PARIS: Yes
 
Plug Power Inc. - 1801 21 04A
Plug Power Inc. is proposing a $232 million project at the Western New York Science & Technology Advanced Manufacturing Park in the town of Alabama. The operation will produce green hydrogen using an electrolysis process of water utilizing clean hydropower.
Project Application
Supplemental Application
Initial Resolution - Approved March 4, 2021
Public Hearing - March 22, 2021 - Notice - Minutes - Video
Public Hearing - June 3, 2021 - Notice - Minutes - Video
Final Resolution - Approved March 25, 2021
Supplemental Resolution - Approved June 3, 2021
Agent Agreement
Project Close Date - November 8, 2021
Report to PARIS: Yes
 
Forefront Power LLC (Elba Solar) (Final Resolution Approved)
Forefront Power LLC is proposing a 5 MW community solar farm project in the Town of Elba (Elba School District) that will be interconnected with National Grid and provide power to subscribers.

Project Application
Initial Resolution - Approved March 4, 2021
Public Hearing - March 22, 2021 - Notice - Minutes - Video
Final Resolution -  Approved May 6, 2021
Agent Agreement
Project Close Date
Report to PARIS: Project in Process
 
Solar Liberty 1 (Final Resolution Approved)
Solar Liberty is proposing a 4 MW community solar farm project in the Town of Pembroke (Akron School District) that will be interconnected with National Grid and provide power to subscribers.

Project Application
Initial Resolution - Approved March 4, 2021
Public Hearing - March 22, 2021 - Notice - Minutes - Video
Final Resolution -  Approved March 25, 2021
Agent Agreement
Project Close Date
Report to PARIS: Project in Process
 
Solar Liberty 2 (Final Resolution Approved)
Solar Liberty is proposing a 5 MW community solar farm project in the Town of Pembroke (Akron School District) that will be interconnected with National Grid and provide power to subscribers.

Project Application
Initial Resolution - Approved March 4, 2021
Public Hearing - March 22, 2021 - Notice - Minutes - Video
Final Resolution -  Approved March 25, 2021
Agent Agreement
Project Close Date
Report to PARIS: Project in Process
 
Excelsior Energy Center (Final Resolution Approved)
Excelsior Energy Center is proposing a 280 MW utility scale solar project in the Town of Byron (Byron-Bergen School District) that will be interconnected with the electric grid.

Project Application
Initial Resolution Approved March 25, 2021
Public Hearing - April 19, 2021 - Notice - Minutes - Video
Final Resolution - Approved June 3, 2021 
Agent Agreement
Project Close Date
Report to PARIS: Project in Process
 
Batavia Special Needs Apartments - 1801 21 09A
Batavia Special Needs Apartments, L.P. is proposing a $3.75 million expansion project in the City of Batavia.  The applicant currently owns and operates a 42 unit building of special needs housing, and will construct an additional 20 units for a total of 62 units. 

Project Application
Initial Resolution Approved March 25, 2021
Public Hearing - April 14, 2021 - Notice - Minutes - Video
Final Resolution - Approved May 6, 2021
Agent Agreement
Project Close Date - September 15, 2021
Report to PARIS: Yes
 
NY CDG Genesee 1 LLC (Final Resolution Approved)
The company is proposing a 5 MW community solar farm project in the Town of Elba (Elba School District) that will be interconnected with National Grid and provide power to subscribers.

Project Application

Initial Resolution Approved May 6, 2021
Public Hearing - May 17, 2021 - Notice - Minutes - Video
Final Resolution - Approved August 5, 2021
Agent Agreement
Project Close Date
Report to PARIS: Project in Process
 
Gateway GS, LLC - 1801 21 15A
Gateway GS LLC (Gallina Development) is proposing to build out a third building at the GCEDC's Gateway II Corporate Park in the town of Batavia. Facility will be 27,000 SF and will be completed in 2022 for a single logistics-distribution tenant.

Project Application

Initial Resolution - Approved July 1, 2021
Public Hearing - July 23, 2021 - Notice - Minutes - Video
Final Resolution - Approved August 5, 2021
Updated Final Resolution - Approved January 13, 2022
Authorizing Resolution - Approved March 3, 2022
Agent Agreement
Project Close Date - September 29, 2021
Report to PARIS: Yes
 
Trousdale Solar, LLC - 1801 21 12A
The company is proposing a 5 MW community solar farm project in the Town of Batavia (Batavia School District) that will be interconnected with National Grid and provide power to subscribers.

Project Application
Initial Resolution - Approved July 1, 2021
Public Hearing - July 23, 2021 -  Notice - Minutes - Video
Final Resolution - Approved August 5, 2021
Agent Agreement
Project Close Date - April 7, 2022
Report to PARIS: Project in Process
 
Trousdale Solar II, LLC - 1801 21 13A
The company is proposing a 4 MW community solar farm project in the Town of Batavia (Batavia School District) that will be interconnected with National Grid and provide power to subscribers.

Project Application
Initial Resolution - Approved July 1, 2021
Public Hearing - July 23, 2021 - Notice - Minutes - Video
Final Resolution - Approved August 5, 2021
Agent Agreement
Project Close Date - April 7, 2022
Report to PARIS: Project in Process
 
Just Chez Realty (206 E. Main St.) (Final Resolution Approved)
Just Chez Realty, LLC, is proposing a $450,000 renovation project in the City of Batavia as part of Batavia's Downtown Revitalization Initiative. The project will create 2 market-rate apartments and follows the completion of first-floor improvements to the building.

Project Application
Final Resolution - Approved July 1, 2021
Agent Agreement
Project Close Date - February 28, 2022
Report to PARIS: Project in Process
 
Liberty Pumps - 1801 21 16A
Liberty Pumps is proposing to expand their operation in the Town of Bergen at Apple Tree Acres industrial park. The company is planning on constructing a warehouse and manufacturing space of 107,138 sf to support continuing growth of Liberty Pumps.  The project is investing $13.7 million and is pledging to create 30 FTEs with an average salary of $52,000 annually plus benefits.

Project Application
Initial Resolution - Approved August 5, 2021
Public Hearing - August 26, 2021 - Notice - Minutes - Video
Final Resolution - Approved September 9, 2021
Agent Agreement
Project Close Date - November 21, 2021
Report to PARIS: Yes
 
Valiant Real Estate USA Inc - 1801 21 17A
Valiant Real Estate USA, Inc. is proposing to build a new 20,000 sq. ft. facility on the corner of Saile Drive and Call Parkway in the town of Batavia. The project is investing $4.5 million and is pledging to create 24 FTEs with an average salary range of $30,000-$75,000 annually plus benefits.

Project Application
Initial Resolution - Approved September 9, 2021
Public Hearing - October 5, 2021 - Notice - Minutes - Video
Final Resolution - Approved December 2, 2021
Agent Agreement
Project Close Date - December 21, 2021
Report to PARIS: Yes
 
J&R Fancher Property Holdings LLC (Brickhouse Commons LLC)
J&R Fancher Property Holdings, LLC is proposing the to construct a 14,000 square foot 2-story mixed-used building on 2.6 buildable acres at Buffalo East Technology Park in Pembroke, NY.
The $1.7 million project includes the creation of 6 market rate 1-bedroom and 2-bedroom apartments on the second floor, and a 7,000 "vanilla" box interior space to attract commercial tenants.

Project Application
Initial Resolution - Approved September 9, 2021
Public Hearing - October 5, 2021 - Notice - Minutes - Video
Final Resolution - Approved October 7, 2021
Agent Agreement
Project Close Date - May 19, 2022
Report to PARIS: Project in Process
 
Mega Properties (Final Resolution Approved)
Mega Properties, Inc. is proposing to purchase a 147,000 square foot distribution facility on Federal Drive in the town of Batavia.

The project is investing $8.5 million and is pledging to create 11 FTEs with an average salary range of $30,000-$80,000 annually plus benefits.
Project Application
Initial Resolution - Approved December 2, 2021
Public Hearing - December 21, 2021 - Notice - Minutes - Video
Final Resolution - Approved January 13, 2022
Agent Agreement
Project Close Date
Report to PARIS: Project in Process

2020 Projects

Ellicott Station LLC - 801 21 07A
The Ellicott Station project is a proposed mixed-use brownfield redevelopment project including adaptive re-use and new construction of a blighted property in the city of Batavia. The $22.4 million total investment would complete the brownfield remediation of the 3.31-acre site, construct a new five-story modern workforce housing apartment building, and renovate an existing building for a restaurant/beer garden and brewery.
Project Application
Initial Resolution - Approved February 6, 2020
Public Hearing - March 3, 2020 - Notice Minutes - Video
Final Resolution - Approved March 5, 2020
Authorizing Resolution - Approved July 1, 2021
Authorizing Resolution - Approved October 28, 2021
Agent Agreement
Project Close Date - July 21, 2021
Report to PARIS: Yes

 

Ellicott Station Commercial LLC - 1801 21 08A
The Ellicott Station project is a proposed mixed-use brownfield redevelopment project including adaptive re-use and new construction of a blighted property in the city of Batavia. The $22.4 million total investment would complete the brownfield remediation of the 3.31-acre site, construct a new five-story modern workforce housing apartment building, and renovate an existing building for a restaurant/beer garden and brewery.
Project Application
Initial Resolution - Approved February 6, 2020
Public Hearing - March 3, 2020 - Notice Minutes - Video
Final Resolution - Approved March 5, 2020
Authorizing Resolution - Approved July 1, 2021
Authorizing Resolution - Approved October 28, 2021
Agent Agreement
Project Close Date - July 21, 2021
Report to PARIS: Yes
 
Borrego Solar - 241 Knapp Solar 1, LLC - 1801 20 01A
241 Knapp Solar 1, LLC is a proposed community solar project in the town of Pembroke (Akron School District) that would generate 5 MW of power to subscribers.
Project Application
Initial Resolution - Approved February 6, 2020
Public Hearing - February 28, 2020 - Notice - Minutes - Video
Final Resolution - Approved March 5, 2020
Agent Agreement
Project Close Date - December 22, 2020
Report to PARIS: Yes
 
Borrego Solar - 241 Knapp Solar 2, LLC - 1801 20 02A
241 Knapp Solar 2, LLC is a proposed community solar project in the town of Pembroke (Akron School District) that would generate 5 MW of power to subscribers.
Project Application
Initial Resolution - Approved February 6, 2020
Public Hearing - February 28, 2020 - Notice - Minutes - Video
Final Resolution - Approved March 5, 2020
Agent Agreement
Project Close Date - December 22, 2020
Report to PARIS: Yes
 
Borrego Solar - Townline Batavia Solar 1, LLC - 1801 20 03A
Townline Batavia Solar 1, LLC is a proposed community solar project in the town of Batavia (Elba School District) that would generate 5 MW of power to subscribers.
Project Application
Initial Resolution - Approved February 6, 2020
Public Hearing - March 2, 2020 - Notice - Minutes - Video
Final Resolution - Approved March 5, 2020
Agent Agreement
Project Close Date - December 22, 2020
Report to PARIS: Yes
 
Borrego Solar - 3104 Batavia Solar, LLC - 1801 02 04A
3104 Batavia Solar, LLC is a proposed community solar project in the town of Batavia (Pembroke School District) that would generate 3 MW of power to subscribers.
Project Application
Initial Resolution - Approved February 6, 2020
Public Hearing - March 2, 2020 - Notice- Minutes - Video
Final Resolution - Approved March 5, 2020
Agent Agreement
Project Close Date - May 22, 2020
Report to PARIS: Yes
 
Borrego Solar - 3232 Batavia Solar, LLC - 1801 02 05A
3232 Batavia Solar, LLC is a proposed community solar project in the town of Batavia (Pembroke School District) that would generate 4 MW of power to subscribers.
Project Application
Initial Resolution - Approved February 6, 2020
Public Hearing - March 2, 2020 - Notice - Minutes - Video
Final Resolution - Approved March 5, 2020
Agent Agreement
Project Close Date - May 22, 2020
Report to PARIS: Yes
 
V.J. Gautieri Constructors, Inc. (Ellicott Place) - 1801 20 06A
Ellicott Place is a proposed project to renovate an existing building in the city of Batavia (Batavia School District) that will create 10 market-rate apartments and first-floor business facilities, and exterior building rehabiliation to support tenant retention and attraction. Total investment is $3.1 million.
Project Application
Initial Resolution - Approved February 6, 2020
Public Hearing - March 3, 2020 - Notice Minutes - Video
Final Resolution - Approved March 5, 2020
Agent Agreement
Project Close Date - July 29, 2020
Report to PARIS: Yes
 
Bright Oak Solar, LLC - 1801 20 09A
Bright Oak Solar, LLC is a proposed community solar project in the town of Batavia (Oakfield-Alabama School District) that would generate 4  MW of power to subscribers.
Project Application
Initial Resolution - Approved May 7, 2020
Public Hearing - May 26, 2020 - Notice - Minutes - Video
Final Resolution - Approved June 4, 2020
Agent Agreement
Project Close Date - September 30, 2020
Report to PARIS: Yes
 
J & R Fancher Property Holdings LLC (Final Resolution Approved)
J & R Fancher Property Holdings, LLC is a proposed project that will construct a three-story, mixed-use building  at the Buffalo East Technology Park in Pembroke, NY.

The $3 million project includes the creation of 17 market-rate apartments and four 'vanilla box' spaces for commercial tenants.
Project Application
Initial Resolution - Approved May 7, 2020
Public Hearing Notice - May 26, 2020 - Notice - Minutes - Video
Final Resolution - Approved July 2, 2020
Agent Agreement
Project Close Date
Report to PARIS: Project in Process
 
Fraser-Branche Property, LLC - 1801 20 10A
The company plans to acquire and renovate an existing 13,000 sq. ft. facility in the city of Batavia to accomodate the expansion of their pediatric medical practice alongside existing tenants.
Project Application
Initial Resolution - Approved October 31, 2019
Public Hearing - November 20, 2019 - Notice - Minutes
Final Resolution - July 2, 2020
Agent Agreement
Project Close Date - September 3, 2020
Report to PARIS: Yes
 
Batavia Senior Housing Preservation, LLC (Final Resolution Approved)
The company is proposing a $12.8 million recapitalization and renovation to preserve an existing senior housing apartment complex in City of Batavia.
Project Application
Initial Resolution - Approved July 2, 2020
Public Hearing - August 17, 2020 - Notice - Minutes - Video
Final Resolution - Aprroved Oct. 1, 2020
Agent Agreement
Project Close Date
Report to PARIS: Project in Process
 
Batavia Solar, LLC (Final Resolution Approved)
Batavia Solar, LLC is a proposed community solar project in the town of Batavia (Byron-Bergen School District) that would generate 1.65  MW of power to subscribers.
Project Application
Initial Resolution - Approved August 6, 2020
Public Hearing - September 2, 2020 -  Notice - Minutes - Video
Final Resolution - Approved August 5, 2021
Agent Agreement
Project Close Date
Report to PARIS: Project in Process

2019 Projects


Churchville Fire Equipment Corp. - 1801 19 01A
The company is purchasing an existing facility to be their new truck set-up shop and truck refurbishment center.
Final Resolution - Approved January 10, 2019
Agent Agreement
Project Close Date: February 7, 2019
Report to PARIS: Yes
 
CVO Central, LLC (Custom Vehicle Outfitters) - 1801 19 03A
The distribution company is moving from a leased facility to purchasing the former PW Minor existing facility in the City of Batavia.  The company's project will seek to make renovations to the facility.
Final Resolution - Approved March 28, 2019
Agent Agreement
Project Close Date: June 24, 2019
Report to PARIS: Yes
 
Gateway GS, LLC - 1801 19 04A
The company has built a 27,000 sq. ft. speculative building at Gateway II Corporate Park in Batavia.  This will be Phase 1 of 5; interior buildout of the first building.  The building has been engineered to be flexible for prospective tenants, who will ultimately lease the space and have input to the final buildout.  The tenants that this type of building will attracte include warehouse, distribution, light manufacturing, technology and office space tenants.  
Initial Resolution - Approved February 7, 2019
Public Hearing Notice - March 5, 2019
Public Hearing Minutes
Final Resolution - Approved March 7, 2019
Agent Agreement
Project Close Date: May 1, 2019
Report to PARIS: Yes
 
Graham Corporation - 1801 19 06A
The company has 3 projects on its City of Batavia campus which will renovate 8,000 sq. ft. of existing buildings and add 5,000 sq. ft. of new warehouse space: 1. Expand the welding school to meet the demand for welders, the company will double the current training capacity and will renovate 4, 000 sq. ft.  2. An existing 4, 000 sq. ft. manufacturing building will be repurposed.  3. Construction of a new 5, 000 sq. ft. warehouse to store materials currently being stored outside.
Initial Resolution - Approved February 7, 2019
Public Hearing Notice - February 26, 2019
Public Hearing Minutes
Final Resolution - Approved August 1, 2019
Supplemental Application - Increasing square footage of new constructed warehouse from 5,000 sq. ft. to 8,875 sq. ft., thus increasing benefits.
Supplemental Initial Resolution - Approved August 1, 2019
Supplemental Public Hearing Notice - August 26, 2019
Supplemental Public Hearing Minutes
Supplemental Final Resolution - Approved September 5, 2019
Agent Agreement
Project Close Date:  November 1, 2019
Report to PARIS:
 
Mucher & Clark, LLC (Cedar Street Rentals) - 1801 19 05A
The company plans to build an extension of its retail store by constructing a 6,000 sq. ft. warehouse at 52 Cedar Street.  Cedar Street Sales & Rental has been in Business since 1993 and needs to expand to meet customer demand.
Final Resolution - Approved June 6, 2019
Agent Agreement
Project Close Date: October 4, 2019
Report to PARIS: Yes
 
Provident Batavia, LLC - 1801 19 07A
The company is looking to construct a 13,000 sq. ft. addition to an existing office, warehouse and distribution facility leased to SCP Pools in the Town of Batavia.  This project enables the growth of SCP Pools. 
Initial Resolution - Approved July 11, 2019
Public Hearing Notice - July 30, 2019
Public Hearing Minutes
Final Resolution - Approved September 5, 2019
Agent Agreement
Project Close Date: November 12, 2019
Report to PARIS: Yes
 
Ken Wendt's Propane Gas Service, Inc. - 1801 19 10A
The company is planning to build a 9,600 sq. ft. facility at the corner of Route 19 and North Road in the Town of LeRoy.  The company plans to expand its propane service to local residential, commercial, industrial, and agricultural customers.  
Initial Resolution - Approved August 1, 2019
Public Hearing Notice - August 27, 2019
Public Hearing Minutes
Final Resolution - October 31, 2019
Authorizing Resolution - Approved March 29, 2022
Agent Agreement
Project Close Date: December 18, 2019
Report to PARIS: Yes
 
Six Flags Darien, LLC - 1801 19 08A
The company is adding a new attraction to the park for the 2020 operating season.
Initial Resolution - Approved September 5, 2019
Public Hearing Notice - October 2, 2019
Public Hearing Minutes
Final Resolution - Approved October 3, 2019
Agent Agreement
Project Close Date: October 3, 2019
Report to PARIS: Yes
 
Wright Associates, LLC - 1801 19 09A
The company is planning to acquire and renovate an existing 139,000 sq. ft. facility to expand product lines and distribution markets in the Western New York and the Finger Lakes regions.
Initial Resolution - Approved October 3, 2019
Public Hearing Notice - October 29, 2019
Public Hearing Minutes
Final Resolution - Approved October 31, 2019
Agent Agreement
Project Close Date: November 27, 2019
Report to PARIS: Yes

2018 Projects

Saile Properties, LLC (L&M Specialty Fabrication) - 1801 18 02A
Initial Resolution - Approved September 1, 2016
Public Hearing Notice - September 21, 2016
Public Hearing Minutes
Final Resolution - Approved February 1, 2018
Agent Agreement
Project Close Date: April 1, 2018
Report to PARIS: Yes
 
Xylem Dewatering Solutions, Inc. - 1801 18 03A
Xylem (Godwin Pumps) expanded approx. 10 years ago and is now ready for their phase II expansion.  They are located in the Town of Batavia just south of Saile Drive along Route 98.  The 8,100 sq. ft. expansion will have a capital investment of $820,196.  The company is planning to consolidate their Rochester operatings to Batavia as well.
Initial Resolution - Approved March 29, 2018
Public Hearing Notice - April 17, 2018
Public Hearing Minutes
Final Resolution - Approved May 3, 2018
Agent Agreement
Project Close Date: May 31, 2018
Report to PARIS: Yes
 
Genesee Lumber Co., Inc. - 1801 18 04A
Genesee Lumber Company will demolish an existing structure to make way to build a 7,158 sq. ft. warehouse addition to their opperation in the City of Batavia.  The new warehouse will store lumber and other building products to better service customers in Genesee County and the surrounding region.  This project will contribute to the City of Batavia's BP2 program.
Final Resolution - Approved March 29, 2018
Agent Agreement
Project Close Date: February 28, 2019
Report to PARIS: Yes
 
J-Rental, Inc. - 1801 18 05A
The company is looking to build a 60,000 sq. ft. facility at Apple Tree Acres in Bergen, NY on a 19.5-acre lot.
Initial Resolution - Approved June 7, 2018
Public Hearing Notice - June 26, 2018
Public Hearing Minutes
Final ResolutionApproved July 12, 2018
Agent Agreement
Project Close Date: February 27, 2019
Report to PARIS: Yes
 
Pearl Solar, LLC & Pearl Solar II, LLC - 1801 18 07A (Pearl Solar I), 1801 18 08A (Pearl Solar II)
The company is planning two community solar farm projects in the Town of Batavia.  Both projects have the same address but will have separate parcel tax map numbers.  Each project is a 2 MW solar generation system that will be interconnected with National Grid for a combined total of 4 MW.
Initial Resolutions - Pearl Solar & Pearl Solar II - Approved July 12, 2018
Public Hearing Notices - Pearl Solar & Pearl Solar II - Monday, July 30, 2018
Public Hearing Minutes - Pearl Solar & Pearl Solar II
Final Resolution - Pearl Solar & Pearl Solar II - Approved August 2, 2018
Agent Agreement - Pearl Solar I & Pearl Solar II
Project Closing Date: January 11, 2019
Report to PARIS: Yes
 
Amada North America, Inc. - 1801 18 10A
The company is palnning a 19,000 sq. ft. expansion to their manufacturing facility in the City of Batavia.  In addition to the $2.3M construction project, the company is investing over $6.5M in new equipment for a total investment of over $8.8M.
Initial ResolutionApproved September 6, 2018
Public Hearing Notice October 2, 2018
Public Hearing Minutes
Final ResolutionApproved October 4, 2018
Agent Agreement
Project Close Date: November 9, 2018
Report to PARIS: Yes

2017 Projects


HP Hood, LLC (Project Dairy) - 1801 17 01A
The company is proposing to refurbish and restart the current idle Muller Quaker Dairy processing plan in Batavia, NY.  Plans are to invest $205M in facility, processing and filling equipment, building improvements including adding new construction of a 100,000 sq. ft. refrigerated warehouse.  The company would pledge to create 230 FTE's and purchasing milk supply regionally through its network, if they complete the acquisition.  The company is completeing its due diligence prior to any purchase which includes the approval of any potential incentives. 
Initial Resolution - Approved June 12, 2017
Public Hearing Notice - June 27, 2017
Public Hearing Minutes
Final ResolutionApproved June 27, 2017
Agent Agreement
Project Close Date: June 30, 2017
Report to PARIS: Yes
 
ADVJ Realty, LLC (Coach Tony's) - 1801 17 02A
Coach Tony's, a specialty food processor of sauces, has been a long-time business operating out of a leased building in Bergen, NY.  The company is expanding and planning on constructing a 5,000 sq. ft. building on 3 acres at Apple Tree Acres Corporate Park.
Final Resolution Approved July 11, 2017
Agent Agreement
Project Clost Date: February 20, 2018
Report to PARIS: Yes
 
Freightliner & Western Star of Batavia, LLC - 1801 17 03A
The company is expanding from its current location in West Seneca, NY to a second location on State St. Rd. in the Town of Batavia, NY.  The facility includes new construction of a 40,000 sq. ft. parts warehouse and service center.  The project will be located along the NYS Thruway and next door to Genesee Valley Educational Partnership.
Initial Resolution - Approved July 14, 2016
Public Hearing Notice - July 29, 2016
Public Hearing Minutes
Final Resolution - July 11, 2017
Agent Agreement
Project Close Date: August 31, 2018
Report to PARIS: Yes
 
Genesee and Mohawk Valley Railroad Co., Inc. (GVT)- 1801 17 04A
The company build a 25,000 sq. ft. cross dock facility in 2010 and GCEDC supported the project.  GVT is looking to expand this facility due to increase in demand from local customers and is planning to add 12,160 sq. ft. for a total of 37, 160 sq. ft.
Initial Resolution - Approved March 2, 2017
Public Hearing Notice - March 28, 2017
Public Hearing Minutes
Final Resolution
Agent Agreement
Project Close Date: August 15, 2017
Report to PARIS: Yes
 
6520 N. Lake Rd, LLC (Triple-O Mechanical) - 1801 17 08A
The company is seeking to expand their current facility (6,960 sq. ft.) in the Town of Bergen with an addition of a 7,644 sq. ft. warehouse.
Resolution - Approved October 5, 2017
Agent Agreement
Project Close Date: January 1, 2018
Report to PARIS: Yes
 
212 West Main Street, Inc. (Arby's) - 1801 17 09A
The company is planning on a complete interior and exterior renovation, along with purchasing equipment.  The total project cost is estimated at $895,000.  The project has extraordinary re-development costs associated with the property because it is located within a federally designated flood hazard area.  The project is legally allowable for benefits as it is in/or adjacent to a highly distressed cencus tract. 
Resolution - Approved October 5, 2017
Agent Agreement
Project Close Date: November 1, 2017
Report to PARIS: Yes
 
O-AT-KA Milk Products Cooperative, Inc. - 1801 17 11A
O-AT-KA plans to construct a 20,075-sq. ft. expansion of the current plant located at 4815 Ellicott Street in the City of Batavia to address current space restrictions that limit future growth opportunities for the business.  The company plans to invest approx. $4.3M and retain 308 jobs. 
Initial Resolution - Approved October 5, 2017
Public Hearing Notice - October 24, 2017
Public Hearing Minutes
Final Resolution - Approved October 26, 2017
Agent Agreement
Project Close Date: March 1, 2018
Report to PARIS: Yes

2016 Projects


Genesee County Chamber of Commerce - 1801 16 01A
The Genesee County Chamber of Commerce would like to purchase an existing building at 8276 Park Road in Batavia, NY for use of its offices as well as the Coutny's tourism office.  At this site, the Chamber will renovate the existing building and add a new 560 sq. ft., two-story glass structure for a Genesee County Visitors Tourism Center.  
Resolution - Approved October 1, 2015
Agent Agreement
Project Close Date: January 29, 2016
Report to PARIS: Yes
 
Upstate Niagara Cooperative - 1801 16 03A
The former owner of the facility now owned by Upstate Niagara Cooperative constructed a 3,200 sq. ft. addition to an existing facility to add a new bottle filling machine and package equipment in order to produce drinkable yogurt.
Final Resolution - Approved May 5, 2016
Agent Agreement
PILOT Transfer Resolution
PILOT Assignment & Assumption Agreement
Project Close Date: May 5, 2016
Report to PARIS: Yes
 
Mega Properties - 1801 16 04A
Mega Properties provides distribution services to the United States fo Koolatron Corporation, a Canadian company.  This distribution center has been operating in Batavia, NY since 1979.  Initially, the warehouse rented space on Harvester Ave and graduation from the incubator space to purchasing 3 acres at Gateway I in Batavia and building 25,000 sq. ft.  Two years ago, the company expanded the building from 25,000 sq. ft. to 45,000 sq. ft.  The company rented out 10,000 sq. ft. to another distribution company and utilized the balance for their growth.  The company has experienced more growht and is planning on adding an additional 25,000 sq. ft. that will maximize their footprint on the 3 acre parcel.  Thus, the building will increase to 70,000 sq. ft. 
Economic Impact:  For every $1 of public benefit, the company is investing $18.00 into the local economy.
Public Hearing Notice - March 23, 2016
Public Hearing Minutes
Final Resolution - Approved November 4, 2016
Additional Assistance Resolution - Approved December 16, 2016
Agent Agreement
Project Close Date: May 12, 2017
Report to PARIS: Yes
 
Empire Pipeline Inc. - 1801 07 04B (Extension)
Initial Resolution - Approved October 6, 2016
Public Hearing Notice - October 24, 2016
Public Hearing Minutes
Final Resolution - Approved December 1, 2016
Project Close Date: December 1, 2016
Report to PARIS: Yes

 